SUMMA CONSTRUCTION INDUSTRY AND TRADE INC.

Libya – Tripoli / Burj Al Baher Project Rough Structure Construction (2010 – 2011)

  • Project Date: 2010
  • Construction Area: 48.000m2
  • Contract Duration: 10 Months