SUMMA CONSTRUCTION INDUSTRY AND TRADE INC.
Libya – Tripoli / Burj Al Baher Project Rough Structure Construction (2010 – 2011)
- Project Date: 2010
- Construction Area: 48.000m2
- Contract Duration: 10 Months
Libya – Tripoli / Burj Al Baher Project Rough Structure Construction (2010 – 2011)