EMT ERİMTAN CONSULTING, CONTRACTING AND TRADE INC.

Russia – Krasnodor / 5 Star Hotel Construction (2008 – 2009)

  • Project Date: 25.06.1998
  • Construction Area: 5.376 m²
  • Contract Duration: 12 Months

Russia – Krasnodor / Apart Hotel Construction (2008 – 2009)

  • Project Date: 25.06.1998
  • Construction Area: 5,376 m²
  • Contract Duration: 12 Months

Russia – Moscow / Novi Cheremushka Houses 2 Construction (2007 – 2008)

Russia – Moscow / Novi Cheremushka Houses 1 Construction (2004 – 2005)

Azarbeycan – Baku / SLB Warehouse Construction (2004)

Russia – Moscow / Leninski Theme Houses Construction (2004)

Turkey – İzmit / Earthquake Housing HWYK 2 Package Construction (2002)

Turkey – İzmit / Akarcalı Housing Construction (2002)

Russia – Moscow / Bolotnikovskaya Apartment Construction (2001)

  • Project Date: 08.06.2001
  • Construction Area: 18,540 m²
  • Contract Duration: 6 Months

Turkey – İstanbul / EGS Business Park IDTM Office Blocks Construction (1998 – 1999)